Proposal for Geodyn Solutions and Strategic Partner to Deploy Thorium-Based Nuclear Reactors in Vietnam

Executive Summary

Geodyn Solutions, in collaboration with its strategic partner specializing in thorium technology, proposes the deployment of advanced thorium-based nuclear reactors to address Vietnam’s surging energy demands, coal dependence, and grid modernization needs. This initiative aligns with Vietnam’s Power Development Plan VIII and targets for nuclear capacity by 2035. With a $3 billion budget, we recommend constructing two 300 MW thorium-based reactors (total 600 MW capacity), modeled after efficient thorium reactor designs that derive 60% of energy from thorium.

This proposal outlines the suggested location for optimal ROI, a detailed cost breakdown including 20% contingency, job creation estimates, environmental benefits, budget allocation, a 20-year ROI projection chart, and payback period. The project will enhance energy security, reduce emissions, and position Vietnam as a leader in clean nuclear technology in Asia.

Technology Overview

Thorium-based reactors offer superior efficiency and safety compared to traditional uranium systems. Key features include:

  • High fuel efficiency: Approximately 200g of thorium can generate significant energy output, supporting district-level power for extended periods.
  • Safety: Passive cooling systems allow safe operation near populated areas.
  • Waste reduction: Produces up to 90% less long-lived radioactive waste.
  • Integration: Adaptable for Vietnam’s coal/hydro grid, providing stable baseload power.

These reactors will provide baseload power with a capacity factor of 92%, generating approximately 4.836 TWh annually from two 300 MW units combined.

Suggested Location for Best ROI

We recommend Ninh Thuan Province, specifically Phuoc Dinh and Vinh Hai sites. This location offers:

  • Coastal access for seawater cooling, low seismic risk, and proximity to southern industrial zones, reducing costs by 15-20%.
  • Alignment with government-planned nuclear sites, minimizing permitting delays.
  • ROI optimization: High demand growth (8-10%) and export potential to ASEAN; incentives ensure estimated ROI exceeds 20% annually post-payback.

Alternative sites in Quang Ngai offer lower ROI due to higher logistics costs.

Detailed Cost Breakdown

The total project budget is $3 billion. Costs are optimized for Vietnam’s manufacturing capabilities.

Capital Expenditures (CAPEX) – $2.3 Billion (for Two 300 MW Reactors)

 
CategoryDescriptionCost per Reactor ($ Million)Total for Two Reactors ($ Million)
Site Preparation & InfrastructureLand acquisition, seismic upgrades, cooling systems, and grid integration (leveraging planned sites).140280
Reactor Core & Fuel SystemsThorium-uranium fuel assembly, breeding blankets, and initial thorium loading.400800
Turbine & Generator SetsHigh-efficiency turbines adapted for thorium heat output.190380
Safety & Control SystemsPassive safety features, monitoring, and compliance.145290
Construction & EngineeringLabor, materials, and technology transfer.270540
Subtotal CAPEX 1,1452,290

Operational Expenditures (OPEX) – $140 Million Annually (Post-Commissioning)

 
CategoryDescriptionAnnual Cost per Reactor ($ Million)Total for Two Reactors ($ Million)
Fuel & MaintenanceThorium fuel (low cost), refueling every 18-24 months.1938
Staffing & Operations800 personnel per plant (salaries, training).2754
Waste Management & DecommissioningMinimal waste; thorium reduces long-term storage needs.918
Regulatory & InsuranceCompliance with IAEA and Vietnamese standards.816
Miscellaneous (Utilities, Upgrades)Grid fees, minor repairs.714
Subtotal OPEXEquivalent to ~$29/MWh.70140

20% Contingency

  • Applied to CAPEX: $458 million.
  • Total Project Cost with Contingency: $2.748 billion.
  • Remaining Budget: $252 million.

Job Creation

The project will create jobs in Vietnam’s dynamic economy:

  • Construction Phase (3-5 Years): 4,200 jobs.
  • Operational Phase (Ongoing): 1,600 direct jobs (average salaries ~$8,500/year).
  • Indirect Jobs: 3,200.
  • Total: Over 9,000 jobs in the first decade, contributing ~$130 million annually in wages.

Environmental Benefits

Thorium reactors support Vietnam’s net-zero by 2050:

  • Zero CO2 Emissions: Avoids ~3.5 million tons CO2 annually (displacing coal).
  • Reduced Waste: 80-90% less transuranic waste.
  • Resource Efficiency: Minimizes fuel imports.
  • Safety & Biodiversity: Passive safety; coastal siting protects ecosystems.
  • Sustainability: Reduces air pollution in industrial areas.

Budget Utilization

The $3 billion budget covers all phases:

  • CAPEX + Contingency: $2.748 billion (92% allocation).
  • Pre-Construction: $50 million.
  • Training & Partnerships: $40 million.
  • Reserve: $162 million.

20-Year ROI Chart

Assumptions:

  • Annual Generation: 4.836 TWh.
  • Selling Price: $0.09/kWh (based on current tariffs, optimized for industrial sales).
  • Annual Revenue: $435 million.
  • Annual OPEX: $140 million.
  • Net Annual Cash Flow: $295 million.
  • Initial Investment: $2.748 billion.
 
YearAnnual Revenue ($M)Annual OPEX ($M)Net Cash Flow ($M)Cumulative Cash Flow ($M)ROI (%) (Cumulative Net / Investment)
143514029529510.7
243514029559021.5
343514029588532.2
44351402951,18042.9
54351402951,47553.7
64351402951,77064.4
74351402952,06575.1
84351402952,36085.9
94351402952,65596.6
104351402952,950107.3
114351402953,245118.1
124351402953,540128.8
134351402953,835139.6
144351402954,130150.3
154351402954,425161.0
164351402954,720171.8
174351402955,015182.5
184351402955,310193.2
194351402955,605203.9
204351402955,900214.7

Over 20 years, cumulative net cash flow: $5.9 billion, total ROI: 215% (average annual ~10.7%).

Payback Time

The initial investment of $2.748 billion is recovered in approximately 9.3 years.

Conclusion

This proposal positions Geodyn Solutions and its partner to deliver transformative energy solutions for Vietnam. We recommend immediate feasibility studies and stakeholder engagements. For further details, contact Geodyn Solutions.

You are currently viewing Proposal for Geodyn Solutions and Strategic Partner to Deploy Thorium-Based Nuclear Reactors in Vietnam

Proposal for Geodyn Solutions and Strategic Partner to Deploy Thorium-Based Nuclear Reactors in Vietnam